Project Description

Carlton Court Care Home

PROJECT | Carlton Court Care Homes
SECTOR | Healthcare
SERVICES PROVIDED | Refurbishment
CONSULTANT John Cobb Consulting

BSPS were appointed to carry out a full refurbishment to the care home which included redecorations to the 80 existing bedrooms, whilst the care home was fully occupied.

Five lounge areas were refurbished to include new vinyl and carpet flooring, Tektura wallcoverings, new limestone fireplaces and light fittings. New vinyl flooring, lifestyle kitchens, light fittings and Tektura wallcoverings were also installed to the five dining rooms.

The assisted toilets and bathroom went through a full renovation with patchwork feature wall tiles, sanitaryware and decorations across all floors. BSPS carried out a fit out to the lower ground floor extension which comprised of a new hair and beauty salon, therapy room, big screen cinema room, private dining room, visitor’s toilets and front of house office/training rooms.

The fit out to the rear bedrooms and en-suites extensions included new sanitaryware, floor coverings, decorations, joinery and light fittings. A new panelled corridor wall feature was installed with Tektura wallcoverings themed across each floor and themed end of corridor areas.

RELATED PROJECTS